Cayman
Islands
|
333-75899
|
66-0582307
|
(State
or other jurisdiction of incorporation
or organization)
|
(Commission
File
Number)
|
(I.R.S.
Employer Identification
No.)
|
Exhibit
Number
|
|
Description
|
99.1
|
|
Transocean
Inc. Fleet Update
|
TRANSOCEAN
INC.
|
||
|
|
|
Date: September 15, 2005 | By: | /s/ William E. Turcotte |
Name: | William E. Turcotte | |
Title: | Associate General Counsel | |
Exhibit
Number
|
Description
|
|
Transocean
Inc. Fleet Update
|
Transocean
Inc. (NYSE: RIG) Fleet Update
|
Transocean
Inc. (NYSE: RIG) Fleet Update
|
|||||||||||||||||||
Updated
: September 15, 2005
|
|||||||||||||||||||
New
Firm Contracts and Contract Extensions Noted in
Bold
|
|||||||||||||||||||
Dynamically
Positioned
|
|||||||||||||||||||
Rig
Type/Name
|
Floater
Type
|
Yr.
(1)
Entered Service
|
Water
Depth (ft.)
|
Drilling
Depth
|
Location
|
Client
|
Current
Contract Start/Idle Date
|
Estimated
(2)
Expiration
|
Current
Contract Dayrate (3)
|
Previous
Contract Dayrate (3)
|
|||||||||
|
|||||||||||||||||||
High
Specification Floaters:
|
|||||||||||||||||||
5th
Generation Deepwater (13)
|
|
||||||||||||||||||
Discoverer
Deep Seas(12)
|
ship
|
|
2001
|
10,000
|
35,000
|
USGOM
|
Chevron
|
|
Jan-01
|
|
Jan-06
|
|
$205,000
|
|
N/A
|
||||
|
|
USGOM
|
Chevron
|
|
Jan-06
|
|
Jan-07
|
|
$240,000
|
|
$205,000
|
||||||||
Discoverer
Enterprise
|
ship
|
|
1999
|
10,000
|
35,000
|
USGOM
|
BP
|
|
Dec-04
|
|
Dec-07
|
|
$182,500
|
|
$198,600
|
||||
Discoverer
Spirit (13)
|
ship
|
|
2000
|
10,000
|
35,000
|
USGOM
|
Unocal
|
|
Sep-00
|
|
Dec-05
|
|
$204,000
|
|
N/A
|
||||
|
USGOM
|
Shell
|
|
Dec-05
|
|
Jun-07
|
|
$270,000
|
|
$204,000
|
|||||||||
Deepwater
Discovery
|
ship
|
|
2000
|
10,000
|
30,000
|
Nigeria
|
ExxonMobil
|
|
Sep-05
|
|
Dec-05
|
|
$170,000
|
|
$201,800
|
||||
|
S.
Africa
|
BHPB
|
|
Jan-06
|
|
Feb-06
|
|
$285,000
|
|
$170,000
|
|||||||||
|
|
Jul-06
|
|
planned
30-day shipyard program
|
|
|
|
$285,000
|
|||||||||||
|
Nigeria
|
Total
|
|
Aug-06
|
|
Aug-07
|
|
$357,000
|
|
$285,000
|
|||||||||
|
Nigeria
|
Total
|
|
Aug-07
|
|
Aug-08
|
|
$364,000
|
|
$357,000
|
|||||||||
Deepwater
Frontier
|
ship
|
|
1999
|
10,000
|
30,000
|
Brazil
|
Petrobras
|
|
Mar-04
|
|
May-06
|
|
$145,000
|
|
$158,000
|
||||
|
|
Sep-06
|
|
planned
30-day shipyard program
|
|
|
|
$145,000
|
|||||||||||
|
India
|
Undisclosed
|
|
Oct-06
|
|
Sep-08
|
|
$320,000
|
|
$145,000
|
|||||||||
Deepwater
Millennium
|
ship
|
|
1999
|
10,000
|
30,000
|
USGOM
|
Anadarko
|
|
Jun-05
|
|
Jun-07
|
|
$286,500
|
|
$200,000
|
||||
Deepwater
Pathfinder
|
ship
|
|
1998
|
10,000
|
30,000
|
Nigeria
|
Devon
|
|
Dec-04
|
|
Apr-06
|
|
$190,000
|
|
$175,000
|
||||
Deepwater
Expedition
|
ship
|
|
1999
|
10,000
|
30,000
|
Brazil
|
Petrobras
|
|
Oct-99
|
|
Oct-05
|
|
$135,000
|
|
N/A
|
||||
|
Egypt
|
Shell
|
|
Jan-06
|
|
May-06
|
|
$240,000
|
|
$135,000
|
|||||||||
|
Morocco
|
Petronas
|
|
May-06
|
|
Jul-06
|
|
$320,000
|
|
$240,000
|
|||||||||
Deepwater
Horizon
|
semi
|
|
2001
|
10,000
|
30,000
|
USGOM
|
BP
|
|
Sep-04
|
|
Sep-05
|
|
$165,000
|
|
$200,000
|
||||
|
USGOM
|
BP
|
|
Sep-05
|
|
Sep-07
|
|
$275,000
|
|
$165,000
|
|||||||||
|
USGOM
|
BP
|
|
Sep-07
|
|
Sep-10
|
|
See
Footnote 11
|
|
$275,000
|
|||||||||
Cajun
Express
|
semi
|
|
2001
|
8,500
|
25,000
|
USGOM
|
Chevron
|
|
Jul-05
|
|
Jul-07
|
|
$207,300
|
|
$140,000
|
||||
Deepwater
Nautilus (4)
|
semi
|
2000
|
8,000
|
30,000
|
USGOM
|
Shell
|
|
Jun-00
|
|
Sep-05
|
|
$195,100
|
|
N/A
|
|||||
|
USGOM
|
Shell
|
|
Sep-05
|
|
Sep-06
|
|
$220,000
|
|
$195,100
|
|||||||||
Sedco
Energy
|
semi
|
|
2001
|
7,500
|
25,000
|
Enroute
to Las Palmas
|
|
Sep-05
|
|
planned
100-day shipyard program
|
|
|
|
$175,000
|
|||||
|
|
Nigeria
|
Chevron
|
|
Dec-05
|
|
Nov-07
|
|
$202,000
|
|
$175,000
|
||||||||
Sedco
Express (9)
|
semi
|
|
2001
|
7,500
|
25,000
|
Angola
|
BP
|
|
Jun-05
|
|
Jun-08
|
|
$165,000
|
|
$125,000
|
||||
Other
Deepwater (15)
|
|||||||||||||||||||
Deepwater
Navigator
|
ship
|
|
2000
|
7,200
|
25,000
|
Brazil
|
Shell
|
|
Sep-05
|
|
Sep-05
|
|
$145,000
|
|
$99,300
|
||||
|
Brazil
|
Shell
|
|
Oct-05
|
|
Oct-05
|
|
$113,000
|
|
$145,000
|
|||||||||
|
Brazil
|
Shell
|
|
Nov-05
|
|
Apr-06
|
|
$210,000
|
|
$113,000
|
|||||||||
|
Brazil
|
Petrobras
|
|
Oct-06
|
|
Oct-10
|
|
$180,000
|
|
$210,000
|
|||||||||
Discoverer
534
|
ship
|
|
1975/1991
|
7,000
|
25,000
|
India
|
Reliance
|
|
Jul-05
|
|
Sep-05
|
|
$110,000
|
|
$98,300
|
||||
|
India
|
Reliance
|
|
Sep-05
|
|
Dec-05
|
|
$175,000
|
|
$110,000
|
|||||||||
|
China
|
Husky
|
|
Jan-06
|
|
Feb-06
|
|
$145,000
|
|
$175,000
|
|||||||||
Discoverer
Seven Seas
|
ship
|
|
1976/1997
|
7,000
|
25,000
|
India
|
ONGC
|
|
Feb-04
|
|
Feb-07
|
|
$125,000
|
|
$125,000
|
||||
Transocean
Marianas
|
semi
|
|
1998
|
7,000
|
25,000
|
USGOM
|
BP
|
|
Jun-05
|
|
Feb-06
|
|
$180,000
|
|
$150,000
|
||||
USGOM
|
BP
|
|
Feb-06
|
|
Jan-07
|
|
$250,000
|
|
$180,000
|
||||||||||
Sedco
707
|
semi
|
|
1976/1997
|
6,500
|
25,000
|
Brazil
|
Petrobras
|
|
Feb-04
|
|
Jan-06
|
|
$100,000
|
(8)
|
$100,000
|
||||
|
Brazil
|
|
Feb-06
|
|
planned
60-day shipyard program
|
|
|
|
$100,000
|
||||||||||
|
Brazil
|
Petrobras
|
|
Apr-06
|
|
Apr-10
|
|
$180,000
|
|
$100,000
|
|||||||||
Jack
Bates
|
semi
|
1986/1997
|
5,400
|
30,000
|
Australia
|
Woodside
|
|
Mar-05
|
|
Mar-06
|
|
$89,000
|
|
$125,000
|
|||||
Australia
|
Chevron
|
|
Mar-06
|
|
May-06
|
|
$195,000
|
|
$89,000
|
||||||||||
Peregrine
I (5) (8)
|
ship
|
|
1996
|
5,280
|
25,000
|
Brazil
|
|
Jul-05
|
|
planned
120-day shipyard program
|
|
|
|
$70,000
|
|||||
|
Brazil
|
Petrobras
|
|
Dec-05
|
|
Dec-08
|
|
$112,000
|
|
$70,000
|
|||||||||
Sedco
709
|
semi
|
|
1977/1999
|
5,000
|
25,000
|
Nigeria
|
ADTI
|
|
Aug-05
|
|
Sep-05
|
|
$205,000
|
|
$168,000
|
||||
|
Angola
|
ExxonMobil
|
|
Sep-05
|
|
Jan-06
|
|
$205,000
|
|
$205,000
|
|||||||||
M.G.
Hulme, Jr.
|
semi
|
1983/1996
|
5,000
|
25,000
|
Nigeria
|
Total
|
|
May-05
|
|
Mar-06
|
|
$175,000
|
|
$85,000
|
|||||
Transocean
Richardson
|
semi
|
1988
|
5,000
|
25,000
|
Ivory
Coast
|
CNR
|
|
Oct-03
|
|
May-06
|
|
$85,000
|
|
$45,000
|
|||||
Jim
Cunningham
|
semi
|
1982/1995
|
4,600
|
25,000
|
Egypt
|
BG
|
Jul-05
|
|
Sep-05
|
|
$155,000
|
|
$65,000
|
||||||
|
Egypt
|
BG
|
|
Oct-05
|
|
Nov-05
|
|
$65,000
|
|
$155,000
|
|||||||||
Sedco
710 (8)
|
semi
|
|
1983
|
4,500
|
25,000
|
Brazil
|
Petrobras
|
Oct-01
|
|
Oct-06
|
|
$109,500
|
|
$71,000
|
|||||
|
Brazil
|
Petrobras
|
Oct-06
|
|
Oct-10
|
|
$120,000
|
|
$109,500
|
||||||||||
Transocean
Rather
|
semi
|
1988
|
4,500
|
25,000
|
UKNS
|
BP
|
|
Feb-05
|
|
Oct-05
|
|
$165,000
|
|
$95,000
|
|||||
|
UKNS
|
BP
|
|
Oct-05
|
|
Dec-05
|
|
$190,000
|
|
$165,000
|
|||||||||
|
UKNS
|
BP
|
|
Dec-05
|
|
Mar-06
|
|
$165,000
|
|
$190,000
|
|||||||||
|
UKNS
|
Chevron
|
|
Apr-06
|
|
Sep-06
|
|
$300,000
|
|
$165,000
|
|||||||||
|
UKNS
|
BP
|
|
Sep-06
|
|
Sep-07
|
|
$250,000
|
|
$300,000
|
|||||||||
Transocean
Leader (9)
|
semi
|
1987/1997
|
4,500
|
25,000
|
NNS
|
Statoil
|
|
Jul-04
|
|
Feb-06
|
|
$173,500
|
|
$107,500
|
|||||
|
NNS
|
Statoil
|
|
Feb-06
|
|
Jul-07
|
|
$245,000
|
|
$173,500
|
|||||||||
Sovereign
Explorer
|
semi
|
1984
|
4,500
|
25,000
|
Trinidad
|
BG
|
|
Jul-05
|
|
Sep-05
|
|
$65,000
|
|
$65,000
|
|||||
Other
High Specification (4)
|
|||||||||||||||||||
Henry
Goodrich (10)
|
semi
|
1985
|
2,000
|
30,000
|
E.
Canada
|
Terra
Nova
|
|
Aug-05
|
Feb-06
|
|
$145,000
|
|
$132,600
|
||||||
|
E.
Canada
|
Terra
Nova
|
|
Feb-06
|
|
Aug-06
|
|
$165,000
|
|
$145,000
|
|||||||||
Paul
B. Loyd, Jr.
|
semi
|
1987
|
2,000
|
25,000
|
UKNS
|
BP
|
|
Mar-05
|
Mar-07
|
|
$144,000
|
|
$120,000
|
||||||
Transocean
Arctic (14)
|
semi
|
1986
|
1,650
|
25,000
|
NNS
|
Statoil
|
|
Aug-04
|
Sep-06
|
|
$168,000
|
|
$200,000
|
||||||
|
NNS
|
Statoil
|
|
Sep-06
|
Nov-10
|
|
$260,000
|
|
$168,000
|
||||||||||
Polar
Pioneer (14)
|
semi
|
1985
|
1,500
|
25,000
|
NNS
|
Statoil
|
|
Nov-04
|
Apr-06
|
|
$170,000
|
|
$110,200
|
||||||
|
NNS
|
Statoil
|
|
Apr-06
|
Apr-09
|
|
$280,000
|
|
$170,000
|
Transocean
Inc. (NYSE: RIG) Fleet Update
|
|||||||||||||||||||
Updated
: September 15, 2005
|
|||||||||||||||||||
New
Firm Contracts and Contract Extensions Noted in
Bold
|
|||||||||||||||||||
Dynamically
Positioned
|
|||||||||||||||||||
Rig
Type/Name
|
Floater
Type
|
Yr.
(1)
Entered Service
|
Water
Depth (ft.)
|
Drilling
Depth
|
Location
|
Client
|
Current
Contract Start/Idle Date
|
Estimated
(2)
Expiration
|
Current
Contract Dayrate (3)
|
Previous
Contract Dayrate (3)
|
|||||||||
|
|||||||||||||||||||
Other
Floaters (24)
|
|||||||||||||||||||
Peregrine
III
|
ship
|
|
1976
|
4,200
|
25,000
|
USGOM
|
|
|
|
idle
|
|
|
|
N/A
|
|||||
Sedco
700
|
semi
|
1973/1997
|
3,600
|
25,000
|
E.
Guinea
|
A.
Hess
|
|
Jan-05
|
|
Jan-06
|
|
$90,000
|
|
$84,000
|
|||||
Transocean
Legend
|
semi
|
1983
|
3,500
|
25,000
|
Sakhalin
Is.
|
BP
|
|
Jul-05
|
|
Oct-05
|
|
$120,000
|
|
$55,000
|
|||||
|
Korea
|
KNOC
|
|
Nov-05
|
|
Mar-06
|
|
$185,000
|
|
$120,000
|
|||||||||
|
Sakhalin
Is.
|
BP
|
|
May-06
|
|
Dec-06
|
|
$120,000
|
$185,000
|
||||||||||
Sakhalin
Is.
|
BP
|
|
May-07
|
|
Dec-07
|
|
$120,000
|
$120,000
|
|||||||||||
Transocean
Amirante
|
semi
|
1978/1997
|
3,500
|
25,000
|
USGOM
|
ENI
|
|
Aug-05
|
|
Oct-05
|
|
$115,000
|
|
$86,800
|
|||||
USGOM
|
ENI
|
|
Oct-05
|
|
Nov-05
|
|
$125,000
|
|
$115,000
|
||||||||||
USGOM
|
ENI/Nexen
|
|
Nov-05
|
|
Mar-06
|
|
$115,000
|
|
$125,000
|
||||||||||
USGOM
|
Remington
|
|
Mar-06
|
|
Jun-06
|
|
$102,500
|
|
$115,000
|
||||||||||
USGOM
|
Remington
|
|
Jun-06
|
|
Aug-06
|
|
$135,000
|
|
$102,500
|
||||||||||
C.
Kirk Rhein, Jr.
|
semi
|
1976/1997
|
3,300
|
25,000
|
USGOM
|
|
Mar-02
|
|
idle
|
|
|
|
$63,500
|
||||||
Transocean
Driller (8)
|
semi
|
1991
|
3,000
|
25,000
|
Brazil
|
Petrobras
|
|
Sep-04
|
|
Jul-06
|
|
$53,000
|
|
$52,000
|
|||||
Brazil
|
|
Nov-05
|
|
planned
10-day shipyard program
|
|||||||||||||||
|
Brazil
|
Petrobras
|
|
Aug-06
|
|
Aug-10
|
|
$110,000
|
|
$53,000
|
|||||||||
Falcon
100
|
semi
|
1974/1999
|
2,400
|
25,000
|
USGOM
|
LLOG
|
|
Aug-05
|
Feb-06
|
$105,000
|
|
$85,000
|
|||||||
|
USGOM
|
Deep
Gulf Energy
|
Feb-06
|
Mar-06
|
$145,000
|
$105,000
|
|||||||||||||
Sedco
703
|
semi
|
1973/1995
|
2,000
|
25,000
|
Australia
|
Woodside
|
Aug-05
|
Apr-06
|
$150,000
|
$135,000
|
|||||||||
|
Australia
|
Woodside
|
Apr-06
|
Jan-07
|
$155,000
|
$150,000
|
|||||||||||||
Sedco
711
|
semi
|
1982
|
1,800
|
25,000
|
UKNS
|
Shell
|
|
Dec-04
|
Dec-05
|
$50,000
|
|
$45,100
|
|||||||
|
UKNS
|
Shell
|
|
Dec-05
|
Aug-07
|
$150,000
|
|
$50,000
|
|||||||||||
Transocean
John Shaw
|
semi
|
1982
|
1,800
|
25,000
|
UKNS
|
Kerr
McGee
|
|
Jul-05
|
Sep-05
|
$115,000
|
|
$85,000
|
|||||||
|
UKNS
|
Nexen
|
|
Sep-05
|
Oct-06
|
$100,500
|
|
$115,000
|
|||||||||||
Sedco
712
|
semi
|
1983
|
1,600
|
25,000
|
UKNS
|
Oilexco
|
|
Mar-05
|
Mar-06
|
|
$103,000
|
|
$47,000
|
||||||
|
UKNS
|
Oilexco
|
Mar-06
|
Mar-07
|
$150,000
|
$103,000
|
|||||||||||||
Sedco
714
|
semi
|
1983/1997
|
1,600
|
25,000
|
UKNS
|
BG
|
Aug-05
|
Nov-05
|
$160,000
|
$145,000
|
|||||||||
|
UKNS
|
Total
|
Nov-05
|
Feb-06
|
$180,000
|
$160,000
|
|||||||||||||
|
UKNS
|
Total
|
Feb-06
|
Oct-06
|
$200,000
|
$180,000
|
|||||||||||||
Actinia
|
semi
|
1982
|
1,500
|
25,000
|
India
|
Reliance
|
|
Oct-04
|
Jan-06
|
|
$54,000
|
|
$44,000
|
||||||
Sedco
601
|
semi
|
1983
|
1,500
|
25,000
|
Indonesia
|
Santos
|
|
May-05
|
|
Sep-05
|
$56,000
|
|
$77,000
|
||||||
|
Indonesia
|
Santos
|
|
Sep-05
|
|
Oct-05
|
$77,000
|
|
$56,000
|
||||||||||
|
Indonesia
|
Santos
|
|
Oct-05
|
|
Nov-05
|
$56,000
|
|
$77,000
|
||||||||||
|
Indonesia
|
Santos
|
|
Nov-05
|
|
Oct-06
|
$77,000
|
|
$56,000
|
||||||||||
Sedneth
701
|
semi
|
1972/1993
|
1,500
|
25,000
|
Angola
|
Chevron
|
|
Apr-05
|
|
Apr-07
|
$90,000
|
|
$73,000
|
||||||
|
Angola
|
|
Apr-06
|
|
planned
120-day shipyard program
|
|
|
$90,000
|
|||||||||||
Sedco
702
|
semi
|
1973/1992
|
1,500
|
25,000
|
Australia
|
|
Apr-03
|
|
idle
|
|
|
$80,000
|
|||||||
Transocean
Winner
|
semi
|
1983
|
1,500
|
25,000
|
NNS
|
|
Aug-02
|
|
idle
|
|
|
|
$120,000
|
||||||
Transocean
Searcher (14)
|
semi
|
1983/1988
|
1,500
|
25,000
|
NNS
|
Statoil
|
|
Aug-05
|
|
Oct-06
|
|
$121,000
|
|
$122,000
|
|||||
Transocean
Prospect
|
semi
|
1983/1992
|
1,500
|
25,000
|
UKNS
|
|
Oct-02
|
|
idle
|
|
|
|
$98,000
|
||||||
Transocean
Wildcat
|
semi
|
1977/1985
|
1,300
|
25,000
|
UKNS
|
|
Oct-01
|
|
idle
|
|
|
|
$85,000
|
||||||
Transocean
Explorer
|
semi
|
1976
|
1,250
|
25,000
|
UKNS
|
|
Jan-99
|
|
idle
|
|
|
|
$145,000
|
||||||
J.W.
McLean
|
semi
|
1974/1996
|
1,250
|
25,000
|
UKNS
|
ConocoPhillips
|
|
Aug-04
|
|
Dec-05
|
|
$51,000
|
|
$60,000
|
|||||
|
UKNS
|
Shell
|
|
Jan-06
|
|
Jan-07
|
|
$140,000
|
|
$51,000
|
|||||||||
Sedco
704
|
semi
|
1974/1993
|
1,000
|
25,000
|
UKNS
|
Venture
|
|
Jan-05
|
|
Jul-05
|
|
$50,000
|
|
$45,000
|
|||||
|
UKNS
|
Venture
|
|
Jul-05
|
|
Jul-06
|
|
$91,000
|
|
$50,000
|
|||||||||
|
UKNS
|
BG
|
|
Jul-06
|
|
Jan-07
|
|
$175,000
|
|
$91,000
|
|||||||||
Sedco
706
|
semi
|
1976/1994
|
1,000
|
25,000
|
UKNS
|
Total
|
|
Jan-05
|
|
Dec-05
|
|
$78,000
|
|
$57,000
|
Transocean
Inc. (NYSE: RIG) Fleet Update
|
|||||||||||||||||||
Updated
: September 15, 2005
|
|||||||||||||||||||
New
Firm Contracts and Contract Extensions Noted in
Bold
|
|||||||||||||||||||
Dynamically
Positioned
|
|||||||||||||||||||
Rig
Type/Name
|
Floater
Type
|
Yr.
(1)
Entered Service
|
Water
Depth (ft.)
|
Drilling
Depth
|
Location
|
Client
|
Current
Contract Start/Idle Date
|
Estimated
(2)
Expiration
|
Current
Contract Dayrate (3)
|
Previous
Contract Dayrate (3)
|
|||||||||
|
|
||||||||||||||||||
Jackups
(25)
|
|||||||||||||||||||
Interocean
III
|
1978/1993
|
300
|
25,000
|
Egypt
|
Zeitco
|
Jul-05
|
Jul-06
|
$52,300
|
$38,000
|
||||||||||
Shelf
Explorer
|
1982
|
300
|
20,000
|
Indonesia
|
Kodeco
|
Aug-05
|
|
Oct-05
|
|
$70,000
|
|
$48,000
|
|||||||
|
|
|
Singapore
|
Oct-05
|
|
planned
70-day shipyard program
|
|
|
|
$70,000
|
|||||||||
Transocean
Comet
|
1980
|
250
|
20,000
|
Egypt
|
GUPCO
|
|
Oct-03
|
|
Oct-05
|
|
$32,000
|
|
$27,300
|
||||||
|
Egypt
|
|
Dec-06
|
|
planned
14-day shipyard program
|
|
|
|
$32,000
|
||||||||||
Transocean
Mercury
|
1969/1998
|
250
|
20,000
|
Egypt
|
Petrobel
|
|
Jul-05
|
|
Feb-06
|
|
$50,100
|
|
$33,500
|
||||||
|
Egypt
|
|
Sep-06
|
|
planned
7-day shipyard program
|
|
|
|
$50,100
|
||||||||||
Transocean
Nordic
|
1984
|
300
|
25,000
|
India
|
ONGC
|
|
Mar-05
|
|
Mar-07
|
|
$74,200
|
|
$57,800
|
||||||
Trident
II
|
1977/1985
|
300
|
25,000
|
India
|
ONGC
|
|
May-03
|
|
Mar-06
|
|
$60,000
|
|
$34,900
|
||||||
|
India
|
|
Apr-06
|
planned
120-day shipyard program
|
|
|
$60,000
|
||||||||||||
|
India
|
ONGC
|
|
Jul-06
|
Sep-06
|
$60,000
|
|
$60,000
|
|||||||||||
Trident
IV
|
1980/1999
|
300
|
25,000
|
Italy
|
ENI
|
|
May-05
|
Sep-05
|
$57,500
|
|
$78,600
|
||||||||
|
Tunisia
|
Petro-Canada
|
Sep-05
|
Dec-05
|
$120,000
|
$57,500
|
|||||||||||||
Trident
VI
|
1981
|
220
|
21,000
|
Vietnam
|
VSP
|
Apr-05
|
Apr-06
|
$70,500
|
$55,000
|
||||||||||
Trident
VIII
|
1981
|
300
|
21,000
|
Nigeria
|
Conoil
|
Feb-05
|
|
Oct-05
|
|
$55,500
|
|
$43,000
|
|||||||
|
Nigeria
|
Oct-05
|
|
150-day
planned shipyard program
|
|
|
|
$55,500
|
|||||||||||
|
Nigeria
|
Conoil
|
Mar-06
|
|
May-08
|
|
$66,000
|
|
$55,500
|
||||||||||
Trident
IX
|
1982
|
400
|
20,000
|
Vietnam
|
JVPC
|
|
Sep-05
|
|
Sep-06
|
|
$77,200
|
|
$60,000
|
||||||
Trident
XII
|
1982/1992
|
300
|
25,000
|
India
|
ONGC
|
|
Nov-03
|
|
Nov-06
|
|
$62,250
|
|
$57,000
|
||||||
Trident
XIV
|
1982/1994
|
300
|
20,000
|
Cabinda
|
Chevron
|
Apr-05
|
Apr-06
|
$61,000
|
|
$60,000
|
|||||||||
Trident
15
|
1982
|
300
|
25,000
|
Thailand
|
Unocal
|
Feb-05
|
Feb-06
|
$59,750
|
|
$53,500
|
|||||||||
Trident
16
|
1982
|
300
|
25,000
|
Malaysia
|
Petronas
Carigali
|
Apr-05
|
Nov-05
|
$69,000
|
|
$65,000
|
|||||||||
|
Thailand
|
Unocal
|
|
Nov-05
|
|
Jul-07
|
|
$95,000
|
|
$69,000
|
|||||||||
Trident
17
|
1983
|
355
|
25,000
|
Vietnam
|
Petronas
Carigali
|
May-04
|
May-06
|
$57,500
|
|
$62,000
|
|||||||||
Trident
20
|
2000
|
350
|
25,000
|
Caspian
|
Petronas
Carigali
|
Dec-04
|
May-07
|
$90,000
|
|
$90,000
|
|||||||||
Ron
Tappmeyer
|
1978
|
300
|
25,000
|
India
|
ONGC
|
Nov-03
|
Nov-06
|
$62,250
|
|
$50,100
|
|||||||||
Randolph
Yost
|
1979
|
300
|
25,000
|
India
|
ONGC
|
Nov-03
|
Nov-06
|
$60,750
|
|
$64,000
|
|||||||||
D.R.
Stewart
|
1980
|
300
|
25,000
|
Italy
|
ENI
|
Mar-05
|
Mar-06
|
$54,000
|
|
$51,000
|
|||||||||
G.H.
Galloway
|
1984
|
300
|
25,000
|
Italy
|
ENI
|
Jul-05
|
Jul-06
|
$54,000
|
|
$51,000
|
|||||||||
Harvey
H. Ward
|
1981
|
300
|
25,000
|
Malaysia
|
Petronas
Carigali
|
Jul-05
|
Jul-06
|
$48,200
|
|
$46,350
|
|||||||||
Roger
W. Mowell
|
1982
|
300
|
25,000
|
Malaysia
|
Talisman
|
Nov-04
|
Oct-05
|
$46,350
|
|
$45,000
|
|||||||||
|
Malaysia
|
Truong
Son
|
Oct-05
|
Dec-05
|
$68,200
|
|
$46,350
|
||||||||||||
|
Malaysia
|
Talisman
|
Dec-05
|
Nov-06
|
$48,200
|
|
$68,200
|
||||||||||||
J.T.
Angel
|
1982
|
300
|
25,000
|
Indonesia
|
BP
|
Dec-04
|
Oct-05
|
$60,000
|
|
$50,000
|
|||||||||
|
Singapore
|
Nov-05
|
planned
90-day shipyard program
|
|
|
$60,000
|
|||||||||||||
F.G.
McClintock
|
1975
|
300
|
25,000
|
India
|
ONGC
|
Jan-05
|
Dec-07
|
$50,000
|
|
$50,000
|
|||||||||
C.E.
Thornton
|
1974
|
300
|
25,000
|
India
|
ONGC
|
Oct-04
|
Oct-07
|
$45,000
|
|
$45,000
|
|||||||||
|
|
|
|||||||||||||||||
Self-ErectingTenders
(4)
|
|||||||||||||||||||
Searex
9
|
1981
|
400
|
20,000
|
Congo
|
|
Apr-04
|
|
idle
|
|
|
|
$42,000
|
|||||||
Searex
10
|
1983/1994
|
450
|
21,000
|
Angola
|
Chevron
|
Feb-05
|
|
Feb-06
|
|
$41,000
|
|
$44,000
|
|||||||
Charley
Graves
|
1975
|
500
|
20,000
|
Thailand
|
Unocal
|
|
Apr-05
|
|
Apr-07
|
|
$40,500
|
|
$40,000
|
||||||
W.D.
Kent
|
1977
|
400
|
20,000
|
Malaysia
|
|
Jan-03
|
|
idle
|
|
|
|
$35,000
|
|||||||
|
|
|
|||||||||||||||||
Non-U.S.
Drilling Barges (4)
|
|
|
|
|
|||||||||||||||
Searex
4
|
1981/1989
|
21
|
25,000
|
Indonesia
|
Total
|
Sep-04
|
|
Sep-09
|
|
$39,200
|
|
N/A
|
|||||||
Searex
6
|
1981/1991
|
25
|
25,000
|
Cameroon
|
Jul-02
|
|
idle
|
|
|
|
$27,500
|
||||||||
Searex
12
|
1982/1992
|
25
|
25,000
|
Cameroon
|
Jul-05
|
|
planned
45-day shipyard program
|
|
|
|
$49,000
|
||||||||
Hibiscus (6)
|
1979/1993
|
25
|
16,000
|
Indonesia
|
Total
|
|
Jan-04
|
|
Jan-07
|
|
$47,700
|
|
$44,300
|
||||||
Platform
Rigs (1)
|
|||||||||||||||||||
Cliffs
# 1
|
1988/98
|
18,000
|
Singapore
|
|
|
idle
|
|
|
|
|
|||||||||
Other
(2)
|
|||||||||||||||||||
Joides
Resolution (7)
|
ship
|
|
1978
|
27,000
|
30,000
|
Worldwide
|
IODP
|
Jun-05
|
|
Jan-06
|
|
$67,500
|
|
$66,000
|
|||||
Sedco
135D
|
1966/77/01
|
600
|
Brazil
|
SLB
|
Jun-01
|
|
Jun-09
|
|
$28,500
|
|
N/A
|
Transocean
Inc. (NYSE: RIG) Fleet Update
|
|||||||||||||||||||
Updated
: September 15, 2005
|
|||||||||||||||||||
New
Firm Contracts and Contract Extensions Noted in
Bold
|
|||||||||||||||||||
Dynamically
Positioned
|
|||||||||||||||||||
Rig
Type/Name
|
Floater
Type
|
Yr.
(1)
Entered Service
|
Water
Depth (ft.)
|
Drilling
Depth
|
Location
|
Client
|
Current
Contract Start/Idle Date
|
Estimated
(2)
Expiration
|
Current
Contract Dayrate (3)
|
Previous
Contract Dayrate (3)
|
|||||||||
Fixed-Price
Options
|
|||||||||||||||||||
High
Specification Floaters:
|
|
|
|||||||||||||||||
5th
Generation Deepwater (2)
|
|||||||||||||||||||
Deepwater
Discovery
|
ship
|
2000
|
10,000
|
30,000
|
Nigeria
|
Chevron
|
|
Jan-06
|
|
May-06
|
|
$170,000-$179,000
|
|
|
|||||
Discoverer
Deep Seas
|
ship
|
2001
|
10,000
|
35,000
|
USGOM
|
Chevron
|
|
Jan-07
|
|
Jan-09
|
|
+/-
15% of prior rate
|
|
|
|||||
Other
Deepwater (2)
|
|
|
|
|
|
|
|
|
|||||||||||
Sovereign
Explorer
|
semi
|
1984
|
4,500
|
25,000
|
Venezuela
|
Statoil
/ BG
|
|
Sep-05
|
|
Dec-05
|
|
$65,000
|
|
|
|||||
M.G.
Hulme, Jr.
|
semi
|
1983/1996
|
5,000
|
25,000
|
Nigeria
|
Total
|
|
Mar-05
|
|
Apr-07
|
|
$175,000
|
|
|
|||||
|
|||||||||||||||||||
Other
High-Specification(1)
|
|||||||||||||||||||
Henry
Goodrich
|
semi
|
1985
|
2,000
|
30,000
|
E.
Canada
|
Terra
Nova
|
Aug-06
|
Feb-07
|
Neg.
dayrate capped at $165,000
|
||||||||||
Other
Floaters (2)
|
|||||||||||||||||||
Sedco
706
|
semi
|
1976/1994
|
1,000
|
25,000
|
UKNS
|
Total
|
|
Jan-06
|
|
Mar-06
|
|
$75,000
|
|
|
|||||
Actinia
|
semi
|
1982
|
1,500
|
25,000
|
India
|
Reliance
|
|
Jan-06
|
|
May-06
|
|
$54,000
|
|
|
|||||
Jackups
(1)
|
|
|
|
|
|||||||||||||||
D.R.
Stewart
|
1980
|
300
|
25,000
|
Italy
|
ENI
|
|
Mar-06
|
|
Mar-07
|
|
$57,000
|
|
|
||||||
Self-ErectingTenders
(1)
|
|||||||||||||||||||
Searex
10
|
1983/1994
|
450
|
21,000
|
Angola
|
Chevron
|
|
Feb-06
|
|
Aug-06
|
|
$41,000
|
|
|
(1)
|
Dates
shown are the original service date and the date of the most recent
upgrade, if any.
|
(2)
|
Expiration
dates represent the company's current estimate of the earliest date
the
contract for each rig is likely to expire. Some rigs have two contracts
in
continuation, so the second line shows the estimated earliest
availability. Many contracts permit the client to extend the
contract.
|
(3)
|
Represents
the full operating dayrate, although the average dayrate over the
term of
the contract will be lower and could be substantially lower. Does
not
reflect incentive programs which are typically based on the rig's
operating performance against a performance
curve.
|
(4)
|
The
rig is leased from its owner, an unrelated third party, pursuant
to a
fully defeased lease arrangement.
|
(5)
|
Although
originally constructed in 1982, this unit was substantially upgraded
in
1996.
|
(6)
|
Owned
by a joint venture in which the company has a 75%
interest.
|
(7)
|
Operated
under a management contract with the rig's owner. The rig is currently
engaged in scientific geological coring activities and is owned by
a joint
venture in which the company has a 50% interest. Dayrate indicated
reflects 100% of contract rate.
|
(8)
|
Current
contract provides for a bonus incentive opportunity not reflected
in the
stated current contract dayrate.
|
(9)
|
Dayrate
reflects a base level to be paid over the estimated 450-day contract
period. The rig will receive a dayrate higher than the stated base
level
when utilized in a water depth of greater than 2,000
feet.
|
(10)
|
An
arbitration process to determine the rig's dayrate, disputed by the
client
since February 2005, was concluded in June 2005, resulting in a revised
dayrate of $132,600.
|
(11)
|
Dayrate
for contract period September 2007 through September 2010 to be set
using
a quarterly average of the stated contract dayrates on the company's
other
Fifth-Generation, dynamically positioned rigs operating in the U.S.
Gulf
of Mexico.
|
(12)
|
Contract
includes an additional $21,700 per day to cover escalation of costs
over
the contract period.
|
(13)
|
Contract
includes an additional $22,300 per day to cover escalation of costs
over
the contract period.
|
(14)
|
Reflects
contracted dayrate which could slightly change due to foreign exchange
adjustments.
|