Transocean, Inc. Fleet Update |
- 1 -
(d) | Exhibits. |
Exhibit Number | Description | |
99.1
|
Transocean Inc. Fleet Update |
- 2 -
TRANSOCEAN INC. |
||||
Date: July 6, 2007 | By: | /s/ Chipman Earle | ||
Chipman Earle | ||||
Associate General Counsel and Assistant Corporate Secretary |
||||
- 3 -
Exhibit Number | Description | |
99.1
|
Transocean Inc. Fleet Update |
- 4 -
Estimated | ||||||||||||||||||||||||||||||||
Yr. (1) | Current | Expiration | Current | Previous | ||||||||||||||||||||||||||||
Floater | Entered | Water | Drilling | Contract | /Out of | Contract | Contract | |||||||||||||||||||||||||
Rig Type/Name | Type | Service | Depth | Depth | Location | Client | Start/Idle Date | Service(2) | Dayrate(3) | Dayrate(3) | ||||||||||||||||||||||
(Feet) | (Feet) | (Dollars) | (Dollars) | |||||||||||||||||||||||||||||
High Specification Floaters: | ||||||||||||||||||||||||||||||||
Ultra-Deepwater (17) (See Footnotes 12, 13, 14 and 15) | ||||||||||||||||||||||||||||||||
Discoverer Clear Leader
|
ship | * | TBA | 12,000 | 40,000 | USGOM | Chevron | See Footnote 12 | See Footnote 12 | See Footnote 12 | ||||||||||||||||||||||
Discoverer Americas
|
ship | * | TBA | 12,000 | 40,000 | USGOM | Hydro | See Footnote 13 | See Footnote 13 | 475,000 | ||||||||||||||||||||||
Discoverer Inspiration
|
ship | * | TBA | 12,000 | 40,000 | USGOM | Chevron | See Footnote 14 | See Footnote 14 | See Footnote 14 | ||||||||||||||||||||||
Enterprise-class (to be named)
|
ship | * | TBA | 7,500 | 40,000 | Angola | BP | See Footnote 15 | See Footnote 15 | See Footnote 15 | ||||||||||||||||||||||
Discoverer Deep Seas
|
ship | * | 2001 | 10,000 | 35,000 | USGOM | Chevron | Jan-07 | Jan-08 | 276,500 | 240,500 | |||||||||||||||||||||
USGOM | Chevron | Jan-08 | Jan-09 | 317,900 | 276,500 | |||||||||||||||||||||||||||
Feb-08 | 14 days Shipyard or Project | |||||||||||||||||||||||||||||||
USGOM | Chevron | Jan-09 | Jan-11 | 485,000 | 317,900 | |||||||||||||||||||||||||||
Discoverer Enterprise
|
ship | * | 1999 | 10,000 | 35,000 | USGOM | BP | Dec-04 | Dec-07 | 190,900 | 198,600 | |||||||||||||||||||||
USGOM | BP | Dec-07 | Jan-11 | 520,000 | 190,900 | |||||||||||||||||||||||||||
Jun-08 | 60 days Shipyard or Project | |||||||||||||||||||||||||||||||
Discoverer Spirit
|
ship | * | 2000 | 10,000 | 35,000 | USGOM | Shell | Mar-06 | Nov-07 | 294,000 | 204,000 | |||||||||||||||||||||
Dec-07 | 20 days Shipyard or Project | |||||||||||||||||||||||||||||||
USGOM | Anadarko | Dec-07 | Dec-10 | 475,000 | 294,000 | |||||||||||||||||||||||||||
Deepwater Discovery
|
ship | * | 2000 | 10,000 | 30,000 | Nigeria | Total | Mar-07 | Aug-08 | 364,000 | 357,000 | |||||||||||||||||||||
Sep-08 | 60 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
Brazil | Devon | Nov-08 | Nov-13 | 425,000 | 364,000 | |||||||||||||||||||||||||||
Deepwater Frontier
|
ship | * | 1999 | 10,000 | 30,000 | India | Reliance | Aug-06 | Aug-08 | 320,000 | 145,000 | |||||||||||||||||||||
Aug-08 | 15 days Shipyard or Project | |||||||||||||||||||||||||||||||
India | Reliance | Sep-08 | Sep-11 | 477,000 | 320,000 | |||||||||||||||||||||||||||
Deepwater Millennium
|
ship | * | 1999 | 10,000 | 30,000 | USGOM | Anadarko | Jun-07 | Jun-10 | 425,000 | 301,700 | |||||||||||||||||||||
Deepwater Pathfinder
|
ship | * | 1998 | 10,000 | 30,000 | Nigeria | Shell/Devon | Apr-07 | Jul-07 | 190,000 | 395,000 | |||||||||||||||||||||
Nigeria | Shell/Agip/Petrobras | Jul-07 | Jun-09 | 395,000 | 190,000 | |||||||||||||||||||||||||||
Dec-08 | 35 days Shipyard or Project | |||||||||||||||||||||||||||||||
Deepwater Expedition
|
ship | * | 1999 | 10,000 | 30,000 | Egypt | Shell | Jan-07 | Dec-07 | 240,000 | 147,400 | |||||||||||||||||||||
Morocco | Petronas | Jan-08 | Feb-08 | 320,000 | 240,000 | |||||||||||||||||||||||||||
Mar-08 | 140 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
India | Reliance | Jul-08 | Aug-10 | 375,000 | 320,000 | |||||||||||||||||||||||||||
Deepwater Horizon
|
semi | * | 2001 | 10,000 | 30,000 | USGOM | BP | Sep-05 | Sep-07 | 277,500 | 165,000 | |||||||||||||||||||||
Aug-07 | 15 days Shipyard or Project | |||||||||||||||||||||||||||||||
USGOM | BP | Sep-07 | Sep-10 | See Footnote 8 | 277,500 | |||||||||||||||||||||||||||
Cajun Express
|
semi | * | 2001 | 8,500 | 25,000 | USGOM | Chevron | Jul-05 | Aug-07 | 216,400 | 140,000 | |||||||||||||||||||||
USGOM | Chevron | Aug-07 | Feb-10 | 460,000 | 216,400 | |||||||||||||||||||||||||||
May-08 | 15 days Shipyard or Project |
Estimated | ||||||||||||||||||||||||||||||||
Yr. (1) | Current | Expiration | Current | Previous | ||||||||||||||||||||||||||||
Floater | Entered | Water | Drilling | Contract | /Out of | Contract | Contract | |||||||||||||||||||||||||
Rig Type/Name | Type | Service | Depth | Depth | Location | Client | Start/Idle Date | Service(2) | Dayrate(3) | Dayrate(3) | ||||||||||||||||||||||
(Feet) | (Feet) | (Dollars) | (Dollars) | |||||||||||||||||||||||||||||
Deepwater Nautilus
|
semi | 2000 | 8,000 | 30,000 | USGOM | Shell | Dec-06 | Dec-08 | 425,000 | 220,000 | ||||||||||||||||||||||
Dec-08 | 20 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sedco Energy
|
semi | * | 2001 | 7,500 | 25,000 | Nigeria | Chevron | Jan-06 | Jan-08 | 202,000 | 175,000 | |||||||||||||||||||||
TBA | TBA | Jan-08 | Jan-11 | 485,000 | 202,000 | |||||||||||||||||||||||||||
Jun-08 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sedco Express(6)
|
semi | * | 2001 | 7,500 | 25,000 | Angola | BP | Jun-05 | Jul-09 | 169,500 | 125,000 | |||||||||||||||||||||
Jun-08 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
Other Deepwater (16) | ||||||||||||||||||||||||||||||||
Deepwater Navigator
|
ship | * | 2000 | 7,200 | 25,000 | Brazil | Petrobras | Mar-07 | Apr-11 | 180,000 | 300,000 | |||||||||||||||||||||
Discoverer 534
|
ship | * | 1975/1991 | 7,000 | 25,000 | Sep-06 | 330 days Mob/ Contract Prep | |||||||||||||||||||||||||
Pakistan | Shell | Aug-07 | Aug-07 | 245,000 | 245,000 | |||||||||||||||||||||||||||
Sep-07 | 25 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
India | Reliance | Oct-07 | Apr-10 | 250,000 | 245,000 | |||||||||||||||||||||||||||
Discoverer Seven Seas
|
ship | * | 1976/1997 | 7,000 | 25,000 | India | ONGC | Feb-04 | Oct-07 | 125,000 | 125,000 | |||||||||||||||||||||
Nov-07 | 100 days Shipyard or Project | |||||||||||||||||||||||||||||||
India | ONGC | Feb-08 | Mar-11 | 315,800 | 125,000 | |||||||||||||||||||||||||||
Transocean Marianas
|
semi | 1998 | 7,000 | 25,000 | USGOM | BP | Jan-07 | Jan-10 | 435,000 | 250,800 | ||||||||||||||||||||||
Oct-08 | 21 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sedco 707
|
semi | * | 1976/1997 | 6,500 | 25,000 | Brazil | Petrobras | Dec-05 | Jan-10 | 180,000 | 100,000 | |||||||||||||||||||||
Sedco 702
|
semi | * | 6,500 | Singapore | Apr-06 | 550 days Shipyard or Project | ||||||||||||||||||||||||||
TBA | Shell | Oct-07 | Sep-10 | 350,000 | N/A | |||||||||||||||||||||||||||
Jack Bates
|
semi | 1986/1997 | 5,400 | 30,000 | Australia | Woodside | Jun-07 | Feb-08 | 475,000 | 475,000 | ||||||||||||||||||||||
Mar-08 | 35 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
China | PetroChina | Apr-08 | Jun-08 | 475,000 | 475,000 | |||||||||||||||||||||||||||
Jul-08 | 35 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
Australia | Woodside | Aug-08 | Nov-09 | 475,000 | 475,000 | |||||||||||||||||||||||||||
Peregrine I(6)
|
ship | * | 1982/1996 | 5,280 | 25,000 | Brazil | Petrobras | Jan-06 | Feb-09 | 112,000 | 70,000 | |||||||||||||||||||||
Jun-08 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sedco 709
|
semi | * | 1977/1999 | 5,000 | 25,000 | Nigeria | Shell | Oct-06 | Oct-08 | 205,000 | 205,000 | |||||||||||||||||||||
Oct-08 | 45 days Shipyard or Project | |||||||||||||||||||||||||||||||
M.G. Hulme, Jr.
|
semi | 1983/1996 | 5,000 | 25,000 | Jul-07 | 45 days Shipyard or Project | ||||||||||||||||||||||||||
Nigeria | Eni | Aug-07 | Sep-09 | 430,000 | 175,000 | |||||||||||||||||||||||||||
Transocean Richardson
|
semi | 1988 | 5,000 | 25,000 | Angola | Total | Jun-06 | Jul-07 | 355,000 | 85,000 | ||||||||||||||||||||||
TBA | Chevron | Aug-07 | Sep-10 | 450,000 | 355,000 | |||||||||||||||||||||||||||
Mar-08 | 60 days Shipyard or Project | |||||||||||||||||||||||||||||||
Jim Cunningham
|
semi | 1982/1995 | 4,600 | 25,000 | Angola | ExxonMobil | Apr-07 | May-09 | 350,000 | 300,000 | ||||||||||||||||||||||
Sedco 710(6)
|
semi | * | 1983 | 4,500 | 25,000 | Brazil | Petrobras | Oct-06 | Nov-10 | 120,000 | 109,500 | |||||||||||||||||||||
Jan-08 | 85 days Shipyard or Project | |||||||||||||||||||||||||||||||
Transocean Rather (9)
|
semi | 1988 | 4,500 | 25,000 | UKNS | Chevron | Oct-06 | Oct-07 | 300,000 | 190,000 | ||||||||||||||||||||||
Oct-07 | 14 days Shipyard or Project | |||||||||||||||||||||||||||||||
UKNS | BP | Nov-07 | Feb-09 | 250,000 | 300,000 | |||||||||||||||||||||||||||
Mar-08 | 40 days Shipyard or Project |
Estimated | ||||||||||||||||||||||||||||||||
Yr. (1) | Current | Expiration | Current | Previous | ||||||||||||||||||||||||||||
Floater | Entered | Water | Drilling | Contract | /Out of | Contract | Contract | |||||||||||||||||||||||||
Rig Type/Name | Type | Service | Depth | Depth | Location | Client | Start/Idle Date | Service(2) | Dayrate(3) | Dayrate(3) | ||||||||||||||||||||||
(Feet) | (Feet) | (Dollars) | (Dollars) | |||||||||||||||||||||||||||||
UKNS | BP | Feb-09 | Nov-09 | 432,000 | 250,000 | |||||||||||||||||||||||||||
Transocean Leader(7)(9) |
semi | 1987/1997 | 4,500 | 25,000 | NNS | Statoil | Jan-07 | Aug-07 | 276,500 | 248,300 | ||||||||||||||||||||||
Sep-07 | 45 days Shipyard or Project | |||||||||||||||||||||||||||||||
NNS | Statoil | Oct-07 | Jan-08 | 246,500 | 276,500 | |||||||||||||||||||||||||||
NNS | Statoil | Jan-08 | Jul-09 | 340,000 | 246,500 | |||||||||||||||||||||||||||
Sovereign Explorer
|
semi | 1984 | 4,500 | 25,000 | Venezuela | Statoil | Jun-07 | Sep-07 | 65,000 | 65,000 | ||||||||||||||||||||||
Trinidad | BG | Sep-07 | Dec-07 | 65,000 | 65,000 | |||||||||||||||||||||||||||
Dec-07 | 90 days Shipyard or Project | |||||||||||||||||||||||||||||||
Brazil | Repsol | Mar-08 | Feb-10 | 380,000 | 65,000 | |||||||||||||||||||||||||||
Other High Specification (4) | ||||||||||||||||||||||||||||||||
Henry Goodrich
|
semi | 1985 | 2,000 | 30,000 | USGOM | Hydro | Jun-07 | Jun-09 | 350,000 | 173,100 | ||||||||||||||||||||||
Aug-07 | 72 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
Paul B. Loyd, Jr.(9)
|
semi | 1987 | 2,000 | 25,000 | UKNS | BP | Mar-07 | Jun-09 | 322,400 | 145,200 | ||||||||||||||||||||||
Transocean Arctic(9)
|
semi | 1986 | 1,650 | 25,000 | NNS | Statoil | Jan-07 | Jul-11 | 261,100 | 195,400 | ||||||||||||||||||||||
Feb-08 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
Polar Pioneer(9)
|
semi | 1985 | 1,500 | 25,000 | NNS | Statoil | Aug-06 | Jan-10 | 281,100 | 180,700 | ||||||||||||||||||||||
Jul-08 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
Other Floaters (20) | ||||||||||||||||||||||||||||||||
Sedco 700
|
semi | 1973/1997 | 3,600 | 25,000 | E. Guinea | A. Hess | Jan-07 | Feb-08 | 362,600 | 200,000 | ||||||||||||||||||||||
Jun-07 | 40 days Shipyard or Project | |||||||||||||||||||||||||||||||
Transocean Legend
|
semi | 1983 | 3,500 | 25,000 | Sakhalin Is. | BP | Jun-07 | Dec-07 | 120,000 | 435,000 | ||||||||||||||||||||||
Nov-07 | 40 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sakhalin Is. | BP | Feb-08 | Feb-09 | 405,000 | 120,000 | |||||||||||||||||||||||||||
Transocean Amirante
|
semi | 1978/1997 | 3,500 | 25,000 | USGOM | Remington | Apr-07 | Aug-07 | 135,000 | 102,000 | ||||||||||||||||||||||
USGOM | Repsol | Aug-07 | Oct-07 | 325,000 | 135,000 | |||||||||||||||||||||||||||
Oct-07 | 75 days Shipyard or Project | |||||||||||||||||||||||||||||||
USGOM | Eni | Jan-08 | Nov-10 | 350,000 | 325,000 | |||||||||||||||||||||||||||
C. Kirk Rhein, Jr.
|
semi | 1976/1997 | 3,300 | 25,000 | India | Reliance | Feb-07 | Mar-09 | 340,000 | N/A | ||||||||||||||||||||||
Transocean Driller(6)
|
semi | 1991 | 3,000 | 25,000 | Brazil | Petrobras | Aug-06 | Aug-10 | 110,000 | 53,000 | ||||||||||||||||||||||
Feb-08 | 25 days Shipyard or Project | |||||||||||||||||||||||||||||||
Falcon 100
|
semi | 1974/1999 | 2,400 | 25,000 | USGOM | Petrobras | Jul-06 | Aug-07 | 180,000 | 145,000 | ||||||||||||||||||||||
Sedco 703
|
semi | 1973/1995 | 2,000 | 25,000 | Australia | Apache | Mar-07 | Aug-07 | 400,000 | 155,000 | ||||||||||||||||||||||
Australia | Woodside | Aug-07 | Aug-08 | 435,000 | 400,000 | |||||||||||||||||||||||||||
Sedco 711
|
semi | 1982 | 1,800 | 25,000 | UKNS | Shell | Feb-06 | Dec-07 | 150,000 | 50,000 | ||||||||||||||||||||||
UKNS | Shell | Dec-07 | Mar-09 | 283,000 | 150,000 | |||||||||||||||||||||||||||
Feb-08 | 35 Days Shipyard or Project |
|||||||||||||||||||||||||||||||
Transocean John Shaw
|
semi | 1982 | 1,800 | 25,000 | UKNS | Nexen | Jan-06 | Oct-07 | 100,500 | 115,000 | ||||||||||||||||||||||
UKNS | Total | Nov-07 | Feb-08 | 380,000 | 100,500 | |||||||||||||||||||||||||||
Mar-08 | 30 Days Shipyard or Project |
Estimated | ||||||||||||||||||||||||||||||||
Yr. (1) | Current | Expiration | Current | Previous | ||||||||||||||||||||||||||||
Floater | Entered | Water | Drilling | Contract | /Out of | Contract | Contract | |||||||||||||||||||||||||
Rig Type/Name | Type | Service | Depth | Depth | Location | Client | Start/Idle Date | Service(2) | Dayrate(3) | Dayrate(3) | ||||||||||||||||||||||
(Feet) | (Feet) | (Dollars) | (Dollars) | |||||||||||||||||||||||||||||
Sedco 712(9)
|
semi | 1983 | 1,600 | 25,000 | UKNS | Oilexco | Mar-07 | Mar-08 | 228,500 | 150,000 | ||||||||||||||||||||||
UKNS | Oilexco | Mar-08 | Jun-10 | 340,000 | 228,500 | |||||||||||||||||||||||||||
Nov-08 | 40 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sedco 714(9)
|
semi | 1983/1997 | 1,600 | 25,000 | UKNS | Total | Jun-07 | Aug-07 | 350,000 | 200,100 | ||||||||||||||||||||||
UKNS | Total | Sep-07 | Dec-07 | 300,000 | 350,000 | |||||||||||||||||||||||||||
UKNS | Total | Jan-08 | Apr-08 | 250,900 | 300,000 | |||||||||||||||||||||||||||
UKNS | Total | Apr-08 | Feb-09 | 350,000 | 250,900 | |||||||||||||||||||||||||||
Actinia
|
semi | 1982 | 1,500 | 25,000 | India | Reliance | Sep-06 | Jul-09 | 190,000 | 54,000 | ||||||||||||||||||||||
Oct-07 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sedco 601
|
semi | 1983 | 1,500 | 25,000 | Malaysia | Nippon Oil | May-07 | Jul-07 | 330,000 | 406,000 | ||||||||||||||||||||||
Sedneth 701
|
semi | 1972/1993 | 1,500 | 25,000 | Angola | Chevron | Jun-07 | Feb-10 | 360,000 | 90,000 | ||||||||||||||||||||||
Transocean Winner(9)
|
semi | 1983 | 1,500 | 25,000 | NNS | Hydro | Aug-06 | Oct-09 | 357,400 | 120,000 | ||||||||||||||||||||||
Transocean Searcher(9)
|
semi | 1983/1988 | 1,500 | 25,000 | NNS | Statoil | Oct-06 | Jan-09 | 335,500 | 137,500 | ||||||||||||||||||||||
Apr-08 | 45 days Shipyard or Project | |||||||||||||||||||||||||||||||
NNS | Statoil | Jan-09 | Mar-12 | 390,000 | 335,500 | |||||||||||||||||||||||||||
Transocean Prospect(9)
|
semi | 1983/1992 | 1,500 | 25,000 | UKNS | CNR | Sep-06 | Oct-08 | 201,200 | 98,000 | ||||||||||||||||||||||
Nov-08 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
J.W. McLean
|
semi | 1974/1996 | 1,250 | 25,000 | UKNS | Shell | Jul-07 | Sep-08 | 250,000 | 140,000 | ||||||||||||||||||||||
Sep-08 | 30 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sedco 704(9)
|
semi | 1974/1993 | 1,000 | 25,000 | UKNS | BG | Sep-06 | Jul-07 | 175,900 | 92,100 | ||||||||||||||||||||||
Jul-07 | 60 Days Shipyard or project | |||||||||||||||||||||||||||||||
UKNS | BP | Sep-07 | Nov-08 | 312,200 | 175,900 | |||||||||||||||||||||||||||
Sedco 706 (to be upgraded) (10) |
semi | 1976/1994 | 1,000 | 25,000 | UKNS | Total | Nov-06 | Jul-07 | 75,000 | 78,000 | ||||||||||||||||||||||
semi | * | 6,500 | Aug-07 | 108 days Mob/Contract Prep | ||||||||||||||||||||||||||||
Nov-07 | 319 days Shipyard or Project | |||||||||||||||||||||||||||||||
Sep-08 | 79 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
Brazil | Chevron | Nov-08 | Dec-11 | 361,000 | N/A | |||||||||||||||||||||||||||
Jackups (25) | ||||||||||||||||||||||||||||||||
Interocean III
|
1978/1993 | 300 | 25,000 | Egypt | Devon | Jul-06 | Jul-07 | 65,000 | 52,000 | |||||||||||||||||||||||
Egypt | Agiba | Jul-07 | Jun-08(16) | 119,000 | 65,000 | |||||||||||||||||||||||||||
Shelf Explorer
|
1982 | 300 | 20,000 | Malaysia | CTOC | Oct-06 | Sep-07 | 212,200 | 120,000 | |||||||||||||||||||||||
Jul-07 | 14 days Shipyard or Project | |||||||||||||||||||||||||||||||
Oct-07 | 15 days Mob/ Contract Prep | |||||||||||||||||||||||||||||||
Transocean Comet
|
1980 | 250 | 20,000 | Egypt | GUPCO | Oct-05 | Oct-07 | 61,500 | 32,000 | |||||||||||||||||||||||
Transocean Mercury
|
1969/1998 | 250 | 20,000 | Egypt | Petrobel | Feb-06 | Feb-08 | 58,000 | 50,000 | |||||||||||||||||||||||
Transocean Nordic
|
1984 | 300 | 25,000 | India | ONGC | Mar-05 | Dec-07 | 74,200 | 57,800 | |||||||||||||||||||||||
Dec-07 | 100 days Shipyard or Project | |||||||||||||||||||||||||||||||
Trident II
|
1977/1985 | 300 | 25,000 | India | ONGC | Apr-07 | Apr-10 | 147,500 | 60,000 | |||||||||||||||||||||||
Trident IV
|
1980/1999 | 300 | 25,000 | Nigeria | Chevron | Feb-06 | Feb-08 | 90,000 | 120,000 | |||||||||||||||||||||||
Trident VI
|
1981 | 220 | 21,000 | Vietnam | PetroVietnam | Apr-07 | May-08 | 193,100 | 142,100 | |||||||||||||||||||||||
Trident VIII
|
1981 | 300 | 21,000 | Nigeria | Conoil | Apr-06 | May-08 | 66,000 | 55,500 |
Estimated | ||||||||||||||||||||||||||||||||
Yr. (1) | Current | Expiration | Current | Previous | ||||||||||||||||||||||||||||
Floater | Entered | Water | Drilling | Contract | /Out of | Contract | Contract | |||||||||||||||||||||||||
Rig Type/Name | Type | Service | Depth | Depth | Location | Client | Start/Idle Date | Service(2) | Dayrate(3) | Dayrate(3) | ||||||||||||||||||||||
(Feet) | (Feet) | (Dollars) | (Dollars) | |||||||||||||||||||||||||||||
Trident IX
|
1982 | 400 | 20,000 | Vietnam | JVPC | Aug-06 | Aug-07 | 189,500 | 77,100 | |||||||||||||||||||||||
Vietnam | JVPC | Aug-07 | Aug-08 | 210,000 | 189,500 | |||||||||||||||||||||||||||
Trident XII
|
1982/1992 | 300 | 25,000 | India | ONGC | Jan-07 | Feb-10 | 147,500 | 62,250 | |||||||||||||||||||||||
Trident XIV
|
1982/1994 | 300 | 20,000 | Cabinda | Chevron | Jun-06 | Feb-09 | 98,000 | 61,000 | |||||||||||||||||||||||
Jan-07 | 250 days Shipyard or Project | |||||||||||||||||||||||||||||||
Trident 15
|
1982 | 300 | 25,000 | Thailand | Chevron | Feb-06 | Oct-11 | 100,000(11) | 59,750 | |||||||||||||||||||||||
May-07 | 170 days Shipyard or Project | |||||||||||||||||||||||||||||||
Trident 16
|
1982 | 300 | 25,000 | Thailand | Chevron | Dec-05 | Oct-07 | 95,000 | 69,000 | |||||||||||||||||||||||
Oct-07 | 15 days Shipyard or Project | |||||||||||||||||||||||||||||||
Trident 17
|
1983 | 355 | 25,000 | Malaysia | Carigali | May-07 | May-10 | 185,000 | 130,000 | |||||||||||||||||||||||
Trident 20
|
2000 | 350 | 25,000 | Caspian | Petronas Carigali | Jan-06 | Jan-10 | 130,000 | 90,000 | |||||||||||||||||||||||
Jun-07 | 14 days Shipyard or Project | |||||||||||||||||||||||||||||||
Nov-07 | 14 days | |||||||||||||||||||||||||||||||
Shipyard or Project | ||||||||||||||||||||||||||||||||
Feb-08 | 14 days | |||||||||||||||||||||||||||||||
Shipyard or Project | ||||||||||||||||||||||||||||||||
Ron Tappmeyer
|
1978 | 300 | 25,000 | India | ONGC | Feb-07 | Feb-10 | 147,500 | 62,250 | |||||||||||||||||||||||
Randolph Yost
|
1979 | 300 | 25,000 | India | ONGC | Mar-07 | Mar-10 | 147,500 | 60,750 | |||||||||||||||||||||||
D.R. Stewart
|
1980 | 300 | 25,000 | Italy | Eni | Apr-07 | Apr-10 | 168,000 | 57,000 | |||||||||||||||||||||||
G.H. Galloway
|
1984 | 300 | 25,000 | Italy | Eni | Aug-06 | Aug-08 | 115,000 | 54,000 | |||||||||||||||||||||||
Harvey H. Ward
|
1981 | 300 | 25,000 | Malaysia | Talisman | Mar-07 | Aug-08 | 110,000 | 115,800 | |||||||||||||||||||||||
Roger W. Mowell
|
1982 | 300 | 25,000 | Malaysia | Talisman | Nov-06 | Dec-08 | 110,000 | 48,200 | |||||||||||||||||||||||
J.T. Angel
|
1982 | 300 | 25,000 | India | ONGC | Mar-07 | Apr-10 | 147,500 | 105,000 | |||||||||||||||||||||||
Nov-08 | 15 days Shipyard or Project | |||||||||||||||||||||||||||||||
F.G. McClintock
|
1975 | 300 | 25,000 | India | ONGC | Jan-05 | Feb-08 | 50,000 | 50,000 | |||||||||||||||||||||||
C.E. Thornton
|
1974 | 300 | 25,000 | India | ONGC | May-06 | Mar-08 | 45,000 | 45,000 | |||||||||||||||||||||||
Non-U.S. Drilling Barges (2) | ||||||||||||||||||||||||||||||||
Searex 4
|
1981/1989 | 21 | 25,000 | Indonesia | Total | Sep-04 | Sep-09 | 39,200 | N/A | |||||||||||||||||||||||
Hibiscus(4)
|
1979/1993 | 25 | 16,000 | Indonesia | Total | Mar-07 | Sep-07 | 74,000 | 47,700 | |||||||||||||||||||||||
Sep-07 | 14 days Shipyard or Project | |||||||||||||||||||||||||||||||
Other (2) | ||||||||||||||||||||||||||||||||
Joides Resolution(5)
|
ship | * | 1978 | 27,000 | 30,000 | Singapore | Oct-06 | 380 Days Shipyard or Project | 34,900 | |||||||||||||||||||||||
Worldwide | TAMRF | Jan-08 | Sep-13 | 62,000 | ||||||||||||||||||||||||||||
Sedco 135D
|
1966/77/01 | 600 | Brazil | SLB | Jun-01 | Jun-09 | 28,500 | N/A | ||||||||||||||||||||||||
Fixed-Price Options |
||||||||||||||||||||||||||||||||
High Specification Floaters |
||||||||||||||||||||||||||||||||
Ultra-Deepwater (1) | ||||||||||||||||||||||||||||||||
Sedco Express
|
semi | 2001 | 7,500 | 25,000 | Angola | BP | Jul-09 | Jul-10 | 169,500 | 169,500 | ||||||||||||||||||||||
Other Deepwater (3) | ||||||||||||||||||||||||||||||||
Estimated | ||||||||||||||||||||||||||||||||
Yr. (1) | Current | Expiration | Current | Previous | ||||||||||||||||||||||||||||
Floater | Entered | Water | Drilling | Contract | /Out of | Contract | Contract | |||||||||||||||||||||||||
Rig Type/Name | Type | Service | Depth | Depth | Location | Client | Start/Idle Date | Service(2) | Dayrate(3) | Dayrate(3) | ||||||||||||||||||||||
(Feet) | (Feet) | (Dollars) | (Dollars) | |||||||||||||||||||||||||||||
Discoverer 534
|
ship | * | 1975/1991 | 7,000 | 25,000 | India | Reliance | May-10 | Oct-10 | 250,000 | 250,000 | |||||||||||||||||||||
Sedco 709
|
semi | * | 1977/1999 | 5,000 | 25,000 | Nigeria | Shell | Nov-08 | Nov-09 | 205,000 | 205,000 | |||||||||||||||||||||
Other High Specification (1) | ||||||||||||||||||||||||||||||||
Henry Goodrich
|
semi | 1985 | 2,000 | 30,000 | USGOM | Hydro | May-07 | Jun-10 | 350,000 | 350,000 | ||||||||||||||||||||||
Other Floaters (1) | ||||||||||||||||||||||||||||||||
Transocean Searcher
|
semi | 1983/1988 | 1,500 | 25,000 | NNS | Statoil | Mar-12 | Sep-12 | 390,000 | 390,000 | ||||||||||||||||||||||
Held for Sale (1) | ||||||||||||||||||||||||||||||||
Searex 6
|
1981/1991 | 25 | 25,000 | Cameroon | Jul-02 | Idle | 27,500 | |||||||||||||||||||||||||
Additional 2008 Estimated Potential Out of Service Time By Rig Class | ||||||||||||||||||||||||||||||||
See Out of Service Days (Shipyards, Mobilizations, etc.) on the cover page for a full description. |
Ultra-Deepwater
|
| |
Other Deepwater
|
| |
Other High Spec
|
| |
Other Floater Jackup Other |
60 Days 610 Days 50 Days |
Footnotes: | ||
(1) | Dates shown are the original service date and the date of the most recent upgrade, if any. | |
(2) | Expiration dates represent the companys current estimate of the earliest date the contract for each rig is likely to expire. Some rigs have two contracts in continuation, so the second line shows the estimated earliest availability. Many contracts permit the client to extend the contract. The out of service time represents those days in 2007 and, for certain expected out of service time events, 2008 where the company anticipates that a rig will be out of service and not be available to earn an operating dayrate for a period of 14 days or longer. Please refer to the Out of Service Days (Shipyards, Mobilizations, Etc.) section of the Cover Page for a full description. | |
(3) | Represents the full operating dayrate, although the average dayrate over the term of the contract will be lower and could be substantially lower. Does not reflect incentive programs which are typically based on the rigs operating performance against a performance curve. Please refer to the Client Contract Duration and Dayrates and Risks Associated with Operations section of the Cover Page for a description of dayrates. | |
(4) | Owned by a joint venture in which the company has a 75% interest. | |
(5) | Operated under a management contract with the rigs owner. The rig is currently engaged in scientific geological coring activities and is owned by a joint venture in which a subsidiary of the company has a 50% interest. Dayrate indicated reflects 100% of contract rate. | |
(6) | Current contract provides for a bonus incentive opportunity not reflected in the stated current contract dayrate. | |
(7) | Dayrate reflects a base level to be paid over the estimated 450-day contract period. The rig will receive a dayrate higher than the stated base level when utilized in a water depth of greater than 2,000 feet. | |
(8) | Dayrate for contract period September 2007 through September 2010 to be set using a quarterly average of the stated contract dayrates on the companys other Ultra-Deepwater, dynamically positioned rigs operating in the U.S. Gulf of Mexico. | |
(9) | Reflects contracted dayrate which could change due to foreign exchange adjustments. | |
(10) | Chevron has the right to convert the contract to five years at a dayrate of $300,000. | |
(11) | Dayrate subject to annual adjustment based on market dayrates within specified parameters. | |
(12) | We have been awarded a 5-year drilling contract by Chevron for the construction of an enhanced Enterprise-class drillship to be named the Discoverer Clear Leader. Operations are expected to commence during the second quarter of 2009, after an estimated 30-month shipyard construction phase, followed by sea trials, mobilization to the U.S. Gulf of Mexico and customer acceptance. The contract commencement date is contingent on vendor performance and other factors. During the first three years of the contract, the contract dayrate is $472,300. The dayrate for the last two years of the contract are linked to the standard West Texas Intermediate crude oil price with a floor of $40 per barrel resulting in a contract dayrate of $400,000 and a ceiling of $70 per barrel resulting in a contract dayrate of $500,000. | |
(13) | We have been awarded a 4-year drilling contract by Hydro for the construction of an enhanced Enterprise-class drillship to be named the Discoverer Americas. Operations are expected to commence by mid-2009, after shipyard construction, followed by sea trials, mobilization to the U.S. Gulf of Mexico and customer acceptance. The contract commencement date is contingent on vendor performance and other factors. |
(14) | We have been awarded a contract by Chevron for the construction of an enhanced Enterprise-class drillship to be named the Discoverer Inspiration. The contract has an initial term of five years, but can be converted at the customers election by September 2007 to a three-year duration. Operations are expected to commence during the first quarter of 2010, after shipyard construction, followed by sea trials, mobilization to the U.S. Gulf of Mexico and customer acceptance. The contract commencement date is contingent on vendor performance and other factors. The dayrate to be paid on a five-year contract period is $472,300, or $556,200 should the contract be converted to a three-year term. | |
(15) | We have been awarded a drilling contract by BP for the construction of an enhanced Enterprise-class drillship. The contract has an initial term of five years, but can be converted at the customers election by the end of March 2008 to a seven-year duration. Operations are expected to commence during the third quarter of 2010, after shipyard construction, followed by sea trials, mobilization to Angola and customer acceptance. The contract commencement date is contingent on vendor performance and other factors. The dayrate to be paid on a five-year contract period is $460,000, or $430,000 should the contract be converted to a seven-year term. | |
(16) | The contract has an initial term of one year, but can be converted 18 months with a dayrate of $117,000 at the customers election. |